Lock and Dam 8 Cofferdam

Genoa, Wisconsin
1937
Year the lock and dam opened
110 x 600 ft
Main lock chamber
3 miles
Earthen dike that is part of the project
Mile 679.2
Location on the Upper Mississippi River
Client
U.S. Army Corps of Engineers, St. Paul District
Location
Genoa, Wisconsin
Size
Temporary cofferdam at the auxiliary lock
Market
USACE Civil Works
Team experience

Our role

CITEX team member Mammon Derbas served as Project Manager and Quality Control Manager while with a prior firm. Crews installed the temporary cofferdam that gave a dry work area on the auxiliary lock in an active river, coordinated with lock operations and river traffic.

About the project

Lock and Dam 8 sits in a bluff-lined valley on the Upper Mississippi River near Genoa, Wisconsin, at about river mile 679.2. The Corps completed it in April 1937 as part of the 9-foot navigation channel project, and the St. Paul District operates it. The site includes a 110-by-600-foot main lock, an auxiliary lock bay, a dam with movable gates, 3 miles of dike and two overflow spillways.

Photo: August Schwerdfeger, CC BY 4.0

Sources: Travel Wisconsin: Lock and Dam Number 8 (USACE project description); Wikipedia: Lock and Dam No. 8; ConstructConnect: Lock and Dam (LD) 8 Sheet Pile Installation and Construction (W912ES22C0017)

Scope

Scope of work

  • Project management
  • Contractor Quality Control (three-phase control)
  • Cofferdam material and alignment verification
  • Dewatering monitoring
  • Daily QC reports
More projects

Explore more experience

All projects
Aerial view of the upper Houston Ship Channel with diked dredged material placement areasTeam experience*

USACE Civil Works

Houston Ship Channel Shoreline Protection

Chambers County (Galveston Bay), Texas

U.S. Army Corps of Engineers, Galveston District

Revetments and breakwaters at three placement areas

CITEX team member Mammon Derbas served as Project Manager and Quality Control Manager while with a prior firm. The work rebuilt worn dikes at three placement areas, replaced shoreline protection with more durable materials, and installed breakwaters along the active ship channel, with crews and equipment sequenced around tide windows, weather, and channel traffic.

View project
Aerial view of Lock and Dam 3 on the Upper Mississippi RiverTeam experience*

USACE Civil Works

Lock and Dam 3 and 7 Guide Wall Crib Repair

Upper Mississippi River, Minnesota

U.S. Army Corps of Engineers, St. Paul District

Guide wall rock-filled cribs at two locks

CITEX team member Mammon Derbas served as Project Manager, Quality Control Manager, and Site Safety and Health Officer while with a prior firm. Crews stabilized rock-filled guide wall cribs that river flow and vessel traffic had undermined, restoring safe barge alignment into the locks. The work ran in winter, underwater and below zero, with a cellular concrete mix built to keep its strength and flow in the cold.

View project
Lock and Dam 21 at Quincy, Illinois, with a tow on the Mississippi RiverTeam experience*

USACE Civil Works

Lock and Dam 21 and 22 Concrete Repairs

Quincy, Illinois and Saverton, Missouri

U.S. Army Corps of Engineers, Rock Island District

Guide walls at two locks

CITEX team member Mammon Derbas served as Project Manager and Quality Control Manager while with a prior firm. The guide wall repairs covered full resurfacing of the vertical wall faces, armor replacement, checkposts, kevel rails, and the pedestrian sidewalk, all built during the winter navigation closure with preheated forms and temperature monitoring through placement and curing.

View project

* Projects marked Team experience were delivered by CITEX team members while with prior firms. They show the experience our people bring to every CITEX project.

Ready to get started?

Need testing and inspection on a program like this?

Certified inspectors, accredited testing, and real-time reporting for owners and EPC contractors.
A CITEX inspector in a citexus.com vest reviewing the work with a contractor's foreman on site, a crane boom behind