Houston Ship Channel Shoreline Protection
- 3
- Placement areas: PA 14, PA 15 and Mid Bay
- R-1500
- Riprap armor stone over geotextile and bedding stone
- Chambers County, TX
- Upper Galveston Bay, along the Houston Ship Channel
- Client
- U.S. Army Corps of Engineers, Galveston District
- Location
- Chambers County (Galveston Bay), Texas
- Size
- Revetments and breakwaters at three placement areas
- Market
- USACE Civil Works
Our role
CITEX team member Mammon Derbas served as Project Manager and Quality Control Manager while with a prior firm. The work rebuilt worn dikes at three placement areas, replaced shoreline protection with more durable materials, and installed breakwaters along the active ship channel, with crews and equipment sequenced around tide windows, weather, and channel traffic.
About the project
The U.S. Army Corps of Engineers Galveston District keeps dredged material placement areas along the Houston Ship Channel to hold sediment removed during channel maintenance. This contract repaired and replaced shoreline protection at Placement Areas 14, 15 and Mid Bay in Chambers County, Texas, including work on the outside face of existing dikes and an attached breakwater at the northwest end of PA 15.
Sources: HigherGov: Houston Ship Channel, Texas - Placement Area (PA) Shoreline Protection in Chambers County (solicitation W912HY24B0008); USAspending.gov: Contract W912HY24C0010, Houston Ship Channel - PA Shoreline Protection; DVIDS: USACE Galveston awards $6.2 million contract for shoreline stabilization along Houston Ship Channel (2015, background on placement areas)
Scope of work
- Project management
- Contractor Quality Control (three-phase control)
- Revetment and breakwater material and placement verification
- Dike fill placement and compaction checks
- Daily QC reports
- Test records
Explore more experience
Team experience*USACE Civil Works
Lock and Dam 3 and 7 Guide Wall Crib Repair
Upper Mississippi River, Minnesota
U.S. Army Corps of Engineers, St. Paul District
Guide wall rock-filled cribs at two locks
CITEX team member Mammon Derbas served as Project Manager, Quality Control Manager, and Site Safety and Health Officer while with a prior firm. Crews stabilized rock-filled guide wall cribs that river flow and vessel traffic had undermined, restoring safe barge alignment into the locks. The work ran in winter, underwater and below zero, with a cellular concrete mix built to keep its strength and flow in the cold.
View project
Team experience*USACE Civil Works
Lock and Dam 21 and 22 Concrete Repairs
Quincy, Illinois and Saverton, Missouri
U.S. Army Corps of Engineers, Rock Island District
Guide walls at two locks
CITEX team member Mammon Derbas served as Project Manager and Quality Control Manager while with a prior firm. The guide wall repairs covered full resurfacing of the vertical wall faces, armor replacement, checkposts, kevel rails, and the pedestrian sidewalk, all built during the winter navigation closure with preheated forms and temperature monitoring through placement and curing.
View project
Team experience*USACE Civil Works
Columbia River Channel Improvements, Puget Island
Cathlamet, Washington
U.S. Army Corps of Engineers, Portland District
880 ft of 30-inch steel pipe
CITEX team member Mammon Derbas served as Project Manager, Quality Control Manager, Safety Officer, and Erosion Control Lead while with a prior firm. Crews installed 880 feet of 30-inch steel pipe through the Puget Island levee with concrete gravity structures, inside a short road-closure window, with every field weld made to an approved procedure and inspected before backfill.
View project* Projects marked Team experience were delivered by CITEX team members while with prior firms. They show the experience our people bring to every CITEX project.