Columbia River Channel Improvements, Puget Island
- 3
- 30-inch inside-diameter steel pipes through the Puget Island levee
- Mile 44
- Location on the Columbia River
- 43 ft
- Authorized depth of the Columbia River navigation channel
- Client
- U.S. Army Corps of Engineers, Portland District
- Location
- Cathlamet, Washington
- Size
- 880 ft of 30-inch steel pipe
- Market
- USACE Civil Works
Our role
CITEX team member Mammon Derbas served as Project Manager, Quality Control Manager, Safety Officer, and Erosion Control Lead while with a prior firm. Crews installed 880 feet of 30-inch steel pipe through the Puget Island levee with concrete gravity structures, inside a short road-closure window, with every field weld made to an approved procedure and inspected before backfill.
About the project
Puget Island is a 7.5-square-mile island in the Columbia River near Cathlamet, Washington, protected by a levee. As part of Columbia River Channel Improvements, the Portland District needed steel pipes through the Puget Island levee for permanent use in placing dredged material on upland sites near river mile 44. The work included trenching, a road cut, 30-inch steel pipe on reinforced concrete foundation blocks, and controlled-density backfill.
Photo: Pete Forsyth, CC BY 3.0
Sources: SAM Daily: Columbia River Channel Improvements Pipe Procurement and Installation (W9127N23B0006); USAspending.gov: Contract W9127N24C0007, Columbia River Channel Improvements Pipe Procurement and Install; USACE Portland District: Columbia River Channel Improvement Project (archived page)
Scope of work
- Project management
- Contractor Quality Control (three-phase control)
- Levee excavation and backfill compaction
- Pipe installation and alignment
- AWWA C206 field weld inspection
- Concrete gravity structures
- Site safety
- Erosion and sediment control
Explore more experience
Team experience*USACE Civil Works
Houston Ship Channel Shoreline Protection
Chambers County (Galveston Bay), Texas
U.S. Army Corps of Engineers, Galveston District
Revetments and breakwaters at three placement areas
CITEX team member Mammon Derbas served as Project Manager and Quality Control Manager while with a prior firm. The work rebuilt worn dikes at three placement areas, replaced shoreline protection with more durable materials, and installed breakwaters along the active ship channel, with crews and equipment sequenced around tide windows, weather, and channel traffic.
View project
Team experience*USACE Civil Works
Lock and Dam 3 and 7 Guide Wall Crib Repair
Upper Mississippi River, Minnesota
U.S. Army Corps of Engineers, St. Paul District
Guide wall rock-filled cribs at two locks
CITEX team member Mammon Derbas served as Project Manager, Quality Control Manager, and Site Safety and Health Officer while with a prior firm. Crews stabilized rock-filled guide wall cribs that river flow and vessel traffic had undermined, restoring safe barge alignment into the locks. The work ran in winter, underwater and below zero, with a cellular concrete mix built to keep its strength and flow in the cold.
View project
Team experience*USACE Civil Works
Lock and Dam 21 and 22 Concrete Repairs
Quincy, Illinois and Saverton, Missouri
U.S. Army Corps of Engineers, Rock Island District
Guide walls at two locks
CITEX team member Mammon Derbas served as Project Manager and Quality Control Manager while with a prior firm. The guide wall repairs covered full resurfacing of the vertical wall faces, armor replacement, checkposts, kevel rails, and the pedestrian sidewalk, all built during the winter navigation closure with preheated forms and temperature monitoring through placement and curing.
View project* Projects marked Team experience were delivered by CITEX team members while with prior firms. They show the experience our people bring to every CITEX project.
Need testing and inspection on a program like this?