Skip to content
CITEX
Haul trucks on a dike at the Craney Island dredged material site, Portsmouth, Virginia
USACE Civil Works

Craney Island Earthwork

Portsmouth, Virginia
2,500 acres
Confined dredged material placement site
1957
Year construction was completed
1954–1957
Years the original containment dikes were built
1946
Authorized by the River and Harbor Act
Client
U.S. Army Corps of Engineers, Norfolk District
Location
Portsmouth, Virginia
Size
2,500-acre dredged material site · eight-mile containment dike
Market
USACE Civil Works
Team experience

Our role

CITEX team member Mammon Derbas served as Project Manager and Quality Control Manager while with a prior firm, on borrow area preparation, excavation, and reclamation behind the eight-mile containment dike at the 2,500-acre Craney Island dredged material site.

About the project

The Craney Island Dredged Material Management Area is a 2,500-acre confined disposal site in Portsmouth, Virginia, beside the Port of Hampton Roads. Congress approved it in the River and Harbor Act of 1946 and construction finished in 1957. It holds sediment dredged from Hampton Roads channels. Earthwork contracts prepare borrow areas, reclaim dried dredged material and reuse it to build and raise containment dikes, roads and spillway pads.

Sources: USACE Norfolk District: Craney Island (archived page); SAM Daily: Craney Island Earthwork IDIQ, Portsmouth, Virginia (solicitation W9123621B5007); Virginia Places: Craney Island Dredged Material Management Area

Scope

Scope of work

  • Project management
  • Contractor Quality Control (three-phase control)
  • Excavation limits and grades
  • Fill placement and compaction testing
  • Daily QC reports
More projects

Explore more experience

All projects
Aerial view of the upper Houston Ship Channel with diked dredged material placement areasTeam experience*

USACE Civil Works

Houston Ship Channel Shoreline Protection

Chambers County (Galveston Bay), Texas

U.S. Army Corps of Engineers, Galveston District

Revetments and breakwaters at three placement areas

CITEX team member Mammon Derbas served as Project Manager and Quality Control Manager while with a prior firm. The work rebuilt worn dikes at three placement areas, replaced shoreline protection with more durable materials, and installed breakwaters along the active ship channel, with crews and equipment sequenced around tide windows, weather, and channel traffic.

View project
Aerial view of Lock and Dam 3 on the Upper Mississippi RiverTeam experience*

USACE Civil Works

Lock and Dam 3 and 7 Guide Wall Crib Repair

Upper Mississippi River, Minnesota

U.S. Army Corps of Engineers, St. Paul District

Guide wall rock-filled cribs at two locks

CITEX team member Mammon Derbas served as Project Manager, Quality Control Manager, and Site Safety and Health Officer while with a prior firm. Crews stabilized rock-filled guide wall cribs that river flow and vessel traffic had undermined, restoring safe barge alignment into the locks. The work ran in winter, underwater and below zero, with a cellular concrete mix built to keep its strength and flow in the cold.

View project
Lock and Dam 21 at Quincy, Illinois, with a tow on the Mississippi RiverTeam experience*

USACE Civil Works

Lock and Dam 21 and 22 Concrete Repairs

Quincy, Illinois and Saverton, Missouri

U.S. Army Corps of Engineers, Rock Island District

Guide walls at two locks

CITEX team member Mammon Derbas served as Project Manager and Quality Control Manager while with a prior firm. The guide wall repairs covered full resurfacing of the vertical wall faces, armor replacement, checkposts, kevel rails, and the pedestrian sidewalk, all built during the winter navigation closure with preheated forms and temperature monitoring through placement and curing.

View project

* Projects marked Team experience were delivered by CITEX team members while with prior firms. They show the experience our people bring to every CITEX project.

Ready to get started?

Need testing and inspection on a program like this?